Guangdong Olympic Sports Center Swimming and Diving Hall

Guangdong Olympic Sports Center Swimming

Diving Hall is the main venues of the 2010 Guangzhou Asian Games & the 16th Asian Games Swimming and Diving Project, Department of one of the 12 new venues. The museum assumed the 16th Asian Games in swimming, diving and modern pentathlon swimming competition and the Asian Paralympic swimming competitions, after the game as a national training base south to meet the requirements of a major tournament held after the national team winter training and the Guangzhou Asian Games . seat quantity of

: 45 Guangdong Olympic Sports Center Swimming and Diving the Museum

84

construction of Location:, Dongpu Town the Huangcun

race, Tianhe District, Guangzhou functions: Swimming and Diving the Modern Pentathlon swim

game time from 13 to 26 November: 2010

edit the number of total seats of the design concept of the museum of the design features of 4584, respectively, to set the standard competition pool (including mobile pond shore), a training pool, the Diving Guangdong Olympic Sports Center Swimming and Diving Hall

pool. Designed to be in harmony with the original base environment, the overall layout of the continuation of the overall planning and design concept of the Guangdong Olympic Sports Center Natatorium main form two-color spiral flow modeling, the main building, white and blue and white, both clever metaphor Guangzhou Yunshan beads of water the city of geographic features, the main stadium "streamers" a continuation of the curve. Roof cut by 33 blue and white aluminum alloy plate body combination, creating a wonderful flow line change, the formation of the DNA structure of the gradient, and also suggest that the relationship between the movement and the people. Interludes at the same time by mutual flow modeling, combined with building orientation, good to meet the height of the building interior space, light and ventilation, building energy efficiency and the rational arrangement of equipment and pipeline demand Guangdong Olympic Sports Center Swimming and Diving Hall blue and white gradient DNA structure [1]

. [2-4]

design structure of the museum in the structure of selection, in order to harmonize with complex architectural modeling, swimming pool roof steel structure with 33 bay rectangular space steel truss structure as vertical load-bearing structures, truss width of 3.3 meters , 3.2 meters high. One end of the truss holder is fixed hinge bracket, the other end along the longitudinal direction of the truss (y-direction) of the sliding carriage, and to release the deformation caused by temperature stress. The program makes the roof steel structure has a better stiffness, the wholeness is relatively better, a relatively small amount of steel. [5]

water treatment system the museum in the area of ​​water treatment systems, swimming pool with a sub-flow full ozone disinfection, long-lasting chlorine preparations auxiliary Guangdong Olympic Sports Center Swimming and Diving Hall bird's-eye effect diagram [6]

help disinfect the way. Disinfection can continue to play a role in the sub-flow ozone disinfection is an efficient, economical and practical disinfection methods, compared with the conventional full flow half ozone disinfection, reduce ozone adsorption tank to save investment and the engine room area, and a small amount of ozone entering the pool , reducing the amount of the long-lasting use of the detergent. Swimming pool water treatment project investment equal to only one-third of the Beijing Olympic Aquatic Centre project, but the pool water quality could meet the FINA standards. [5]

edit this paragraph venues function of the museum is the main venues of the 2010 Guangzhou Asian Games Swimming and Diving project, swimming, diving, and modern pentathlon swimming competitions and Asian Paralympic swimming competition held in the museum. The museum swimming pool the mobile pond shore, underwater emergency lifesaving system function. The return side of the standard competition pool increased a mobile pool shore, can be separated into two standard short-course swimming pool, organized the short course race Guangdong Olympic Sports Center Swimming and Diving Hall the diving competitions District panoramic [7]

. [8-9]

edit this paragraph stadiums value of the museum as the particularity of the major sports events venues, decided to design in addition to Guangdong Olympic Sports Center Swimming and Diving Hall to meet the Asian Games complex platform [10]

mixed use requirements, but also give full consideration to the other game as well as the needs of the national fitness sports facilities after the game. Set in the pool in the game to meet the requirements of the Asian Games competition based on mobile pond shore to meet after the game training and short course race, and many other requirements; function room, the layout of the building space combined after the Games were adequate and reasonable consideration. On the other hand, due to limited investment in the design considering the contradictions and problems of the initial investment and operating costs after the game. [5]

edit this paragraph Getting bus Olympic Sports Center North Gate Station:

564 Road the B22 Road 574 Road, 574A Road, 505 Road, 548 Road, 506 Road, B4B Road,, B4A Road, 576 Road

B4 Road the B26 road

Summit Express 26 Road (first class: 07:00 last bus: 08:30)

night 38 Road

of bus Olympic Sports Center Terminus: 60 Road B29 Road

Metro Line 4 Huangcun station

this data derived from Baidu map, the end result to Baidu map data prevail.